Edmonton Waste Management Integrated Process & Transfer Facility

The large recycling facility for the City of Edmonton is a key part in their overall master plan to reduce waste. The project was delivered by the design build approach and was won by Clark Builders and their design team. The organization of the very large pre-engineered structure consists of a 20 foot vertical grade separation to allow vehicles to deposit waste at the higher level. A drive through tunnel for rejected material is below, and a substantial lower area exists for state-of-the-art automated materials separation.

This project interfaces with existing and planned future phases.

Back to portfolio

Close